Miracon was incorporated in 1984 specializing in trading and manufacturing of epoxy systems cater to the construction industry at first. We were involved in supplying materials for the construction of the first longest built bridge in south-east Asia which is the Penang Bridge. For this project, we were supplying through the main contractor of Penang Bridge which was the Hyundai Engineering & Construction Company.